Contractor support · Case study
Closing evidence gaps. Creating a reusable pack.
A facilities services contractor in Edinburgh prepared a more complete submission for CHAS and SafeContractor assessment.
The challenge
The contractor needed scheme approval to support framework tender opportunities. Earlier attempts had stalled because evidence was incomplete and responsibilities were unclear. The team also needed a better way to manage renewals.
The approach
Map the evidence
Compared requirements with policies, assessments, training records, inspection logs and insurance information.
Close documentation gaps
Updated agreed policies and procedures, checked signatures and dates, and clarified responsibilities.
Organise competency records
Collated certificates and created a training matrix with expiry tracking.
Prepare for submission and renewal
Organised the evidence pack, carried out checks and introduced a renewals calendar.
What the work produced
- Criteria-to-evidence tracker
- Updated policy and supporting document pack
- Training matrix and renewal calendar
- Reusable RAMS and toolbox-talk arrangements
The reported outcome
The project recorded first-time CHAS and SafeContractor approvals within 14 days, with no resubmissions. The reusable evidence pack supported subsequent pre-qualification work.
The 14-day result is specific to this project. Consultancy preparation, scheme assessment time and the quality of available evidence vary; approval and turnaround remain subject to the assessor.
This project was delivered by Safety Canvas Consulting. Client identity is not published.
A clear next step
What would practical improvement look like for you?
Let’s discuss your starting point and the support you need.
